Home›Projects

EPC & infrastructure projects

Pipeline condition assessment & rehabilitation.

From robotic pipeline surveys and CCTV condition assessment to WinCan reporting and trenchless rehabilitation, NDT Technologies supports the full project lifecycle.

Project capability at infrastructure scale.

The original NDT Technologies project portfolio includes long-term sewer and storm-water condition assessment, robotic CCTV inspection and trenchless rehabilitation work.

~800 kmSewer pipelines assessed in Mumbai over the cited project period
225–1800 mmPublished pipeline diameter range
300 mCamera inspection reach from one side
10×Optical zoom on the cited pan-and-tilt CCTV system
Robotic pipeline condition assessment

Pipeline survey

Pipeline Condition Assessment Survey

NDT Technologies' original project page describes extensive sewer-pipeline condition assessment in Mumbai, covering diameters from 225 mm to 1800 mm and a cumulative survey length approaching 800 km over a ten-year period.

  • Robotic and camera-based condition assessment
  • Large-diameter sewer and storm-water applications
  • Structured observations for rehabilitation planning
CCTV drainage camera system

CCTV inspection

CCTV Drainage Camera Systems

Camera systems are used for pipe inspection from 6-inch diameter upward, with long inspection reach, autofocus, brightness control and a pan-and-tilt camera head for detailed visual assessment.

  • Up to 300 m inspection reach from one side
  • Pan-and-tilt viewing
  • 10× optical zoom cited on the original project page
WinCan pipeline condition report

Reporting

WinCan Reporting

Inspection observations are organized into professional CCTV condition reports that combine section data, observations, images and diagrams so pipe condition can be reviewed and documented clearly.

Pipeline rehabilitation work

Trenchless rehabilitation

Rehabilitation of Pipeline

Existing sewer and storm-water pipelines can be repaired or upgraded using trenchless rehabilitation approaches selected around condition, geometry and access constraints.

Machine wound spiral lining rehabilitation

MWSL

Machine Wound Spiral Lining

MWSL is presented by NDT Technologies as a rehabilitation method for restoring hydraulic performance and structural integrity in ageing sewers, storm drains and culverts while minimizing excavation.

NDT Technologies pipeline project plant and equipment

Project execution

Plant & Equipment

Dedicated CCTV, cleaning, pumping and rehabilitation equipment supports inspection and project execution in live infrastructure environments.

GRP slip lining rehabilitation

GRP rehabilitation

GRP Pipeline Rehabilitation

GRP-based rehabilitation provides an additional route for upgrading deteriorated pipelines where geometry, access and structural requirements make a liner solution appropriate.

Sewer line after rehabilitation

Outcome

Before & After Rehabilitation

Condition assessment establishes the baseline; rehabilitation then targets structural and hydraulic recovery, followed by post-work visual verification and reporting.

Referenced project organizations.

Organizations represented on the original project page and associated infrastructure work.

Municipal Corporation of Greater MumbaiMunicipal Corporation of Greater Mumbai
UP Jal NigamUP Jal Nigam
Ahmedabad Municipal CorporationAhmedabad Municipal Corporation
Shriram EPCShriram EPC

Planning a pipeline survey or rehabilitation project?

Share the asset diameter, access conditions, approximate length and current condition with the NDT Technologies project team.

Discuss a project